VIP Buildings Relocation
A 2,500-tonne building picked up and put down somewhere else — without taking it apart.
Overview
Relocation of a modular VIP building complex weighing 2,500 tonnes in total, module by module, each one 42 tonnes. Our scope ran from the excavations and footings underneath, through the steel members carrying the modules, to the asphalt they finally sat on.
Scope of work
- Excavation and footings
- Steel members supporting the modules
- Heavy lifting of 42 t modules
- Bolted, bridge-lock, pinned and cast connections
- Asphalt and reinstatement
Disciplines
- Heavy lift
- Relocation
- Civil works
- Steel structures