From site
Progress, milestones and what our crews are doing this week.
6 Aug 2026
Structural steel and light-gauge steel going up under a full HSE regime, with daily toolbox talks before every shift.
18 Jun 2026
After a wind tunnel test, a strengthening scheme and a 1,200-tonne lift, the flag is up.