Main Walkway Relocation
2,000 tonnes of elevated walkway, lifted in segments and set down on a new line.
Overview
Supply and installation of structural steel, plus the full relocation of an elevated walkway weighing 2,000 tonnes. Segments of 22 to 30 tonnes were lifted individually, together with the steel members and handrails carrying them, and re-set on their new alignment.
Scope of work
- Structural steel supply and installation
- Segmental heavy lifting of walkway sections
- Supporting steel members and handrails
- Full relocation and re-alignment
Disciplines
- Heavy lift
- Relocation
- Steel supply
- Installation