Overview
Relocation of a temporary vehicle bridge weighing 270 tonnes across a single 35-metre span. The scope covered the heavy lifts of the steel members and panels, along with new concrete footings sized for the bridge's new position.
Scope of work
- Heavy lifts of steel members and panels
- New concrete footings
- Bolted, bridge-lock, pinned and cast connections
- Long-span handling and setting down
Disciplines
- Heavy lift
- Relocation
- Concrete works
On site