Temporary Bridge Relocation

Work KSKD

Temporary Bridge Relocation

A 270-tonne bridge with a 35-metre clear span, moved intact.

Client

KSKD

Location

Riyadh

Year

2025

Status

Completed

Overview

Relocation of a temporary vehicle bridge weighing 270 tonnes across a single 35-metre span. The scope covered the heavy lifts of the steel members and panels, along with new concrete footings sized for the bridge's new position.

Scope of work

  • Heavy lifts of steel members and panels
  • New concrete footings
  • Bolted, bridge-lock, pinned and cast connections
  • Long-span handling and setting down

Disciplines

  • Heavy lift
  • Relocation
  • Concrete works